Cape Town Solar

Build your system

Answer a few questions and see your recommended system and price instantly.

Upload your bill

Snap a photo or PDF of your latest City of Cape Town bill — we'll read your usage and fill everything in.

Your bill is processed securely and used only to prepare your quote — never shared. See our privacy policy.

Inverter & battery brand

Your recommended system

8kW

Inverter

5.2kWp

9 panels

15.97kWh

Battery

Based on ~625 kWh/month · est. savings R 2 500/mo · Luxpower

Sell your extra power back to the City

With a registered grid-tied system, the City of Cape Town credits you R 1.2623/kWh for power you export — and it offsets your whole municipal account.

13.8kW

Max export on your 60A single-phase supply

64 kWh

Est. exported per month

R 81

Est. monthly credit

Feed-in requires the Home User tariff (R 391/month service charge) and SSEG registration — included with every Cape Town Solar package. Rates: City of Cape Town 2025/26 tariff book.

Your savings & return on investment

What this system puts back in your pocket — bill savings plus feed-in credits.

R 2 500

Est. monthly benefit

R 30 000

Est. yearly savings

3.8 yrs

Payback period

554%

ROI over 25 years

Over 25 years this system could save you about R 750 000 at today's tariffs — and every tariff increase makes the payback faster.

Estimates at current City of Cape Town tariffs, before future increases. Feed-in credit shown net of the Home User service charge.

  • Luxpower 8kW hybrid inverterIncluded
  • Eenovance 15.97kWh wall-mount batteryIncluded
  • 9 × 580W Enersol all-black panelsIncluded
  • Mounting (9 panels)Included
  • PV cable red + black + earth (15m)Included
  • PV DB (1 string)Included
  • AC DB (single phase)Included
  • AC surfix cabling DB → inverter (5m) (allowance)Included
  • Installation & labour (allowance)Included
Installed from (incl. VAT)From R 114 652

Finance it

R 2 579 /month

Request this quote

Installation, cabling and certification are provisional allowances. Final price after a site assessment. Finance illustrative at 12.5% p.a.

By requesting a quote you agree to us using your details to prepare it and contact you. See our privacy policy.